NaqeshGulf Heritage — Design & Execution · التراث الخليجي — تصميمًا وتنفيذًا

Projects

Selected projects

Naqesh was registered in 2025. The projects that follow were carried out by the practice before the company was formed, for the Private Engineering Office of the Amiri Diwan and the Ministry of Culture. The dates are the dates of the work. Full references, roles and scope are available for prequalification.

Souq Waqif at dusk, arcaded facades lit from within
Restoration · State of QatarSouq Waqif, DohaMore than 64,000 square metres restored as a working market, not a museum. The project became a reference for repairing and reusing Qatari heritage buildings.
Reconstruction study painting of Al Wusail fort and town on the coast

Reconstruction · from 2007 · Ministry of Culture

Al Wusail historic town and fort

A coastal town founded in 1900 and dismantled in the 1950s. Reconstruction began in 2007, using surviving foundations and 1940s aerial photographs to rebuild the fort and more than sixty houses.

Reconstruction study · Ministry of Culture collection

The carved timber gate of Al Wusail fort

Rebuilt 2009

The gate of Al Wusail fort

Rebuilt in 2009 from records preserved in Qatar’s museums. Its rosettes, interlace and carved calligraphy remain a direct source for our furniture and gypsum motifs.

Reconstruction study painting of Al Dhaayen town on the shore

Excavation and reconstruction · 2016–2017 · Ministry of Culture

Al Dhaayen historic town

A pearl-diving town founded in 1878 and abandoned when its stone was carried off to the new towns. By early 2017 the settlement had been uncovered, including the Sheikh’s palace and its domed mosque.

Reconstruction study · Ministry of Culture collection

Exhibition hall with display cases of finds from the Al Dhaayen excavation

Exhibition design and build · 2017

The Al Dhaayen discoveries

We designed and built the on-site exhibition that presented what the excavation found: carved ornament from the buildings, the mosque mihrab, coins, copper vessels and the tools of the diving season.

Reconstruction study painting of Balqubaib Mosque by the water

Restoration and reconstruction · 2009, reopened 2012

Balqubaib Mosque, Doha

A traditional domed Qatari mosque, first built in 1878. Restored in 2009 and reopened for prayer in 2012.

Reconstruction study · Ministry of Culture collection

Domes under construction in stone and gypsum at Balqubaib Mosque

Traditional construction · 2009

Forty-four domes, no steel

The domes were built by the historic method, in stone and gypsum, without steel reinforcement — a technique that is barely practised now, and keeping it in use was part of the point.

Also on the record

Eight more, in brief

Dates, roles and scope for any of them are given on request.

Historic houses of Al Wakrah at night

Reconstruction · from 2007

Al Wakrah historic town

The historic town and its souq.

Reconstruction study painting of the Doha Palace

Study · 2021

The Doha Palace, the historic Amiri Diwan

A reconstruction study, Ministry of Culture collection.

Arcaded walkway with patterned floor at the Al Khor souq

Waterfront · 2010 · souq 2014

Al Khor marine frontage

A frontage on the corniche, with the souq at Ain Hleetan.

Restored palace building with arched verandah at Al Kharaan

Restoration · 2013

Sheikh Ali’s palace, Al Kharaan

The palace and its grounds.

Restoration · 2001

Barzan towers, Umm Salal Mohammed

The historic watchtowers, restored and maintained.

Interior design

Office of the Minister of Culture

Carved gypsum, marquetry joinery, patterned stone floor.

Design and execution

Private majlis

No client is named: nothing is published without written consent.

Design and execution

Gulf heritage doors and windows

Carved in the solid, sized to the opening.